Sophisticated crude oil lines
Preconditions for the step-by-step program for the rejection of oil transportation by truck were increased risks and operational expenditures, increased fuel and lubricant prices, and the short service life of vehicles
Learn more![](/upload/resize_cache/iblock/3cb/1140_454_2/Применение современных технологий интенсификации добычи нефти4.png)
Using state-of-the-art technologies for oil production intensification
In July 2017, well No. 16G of Yakshur-Bodinskoye field with a flow rate of 56 tons per day was put into operation.
Learn more![](/upload/resize_cache/iblock/700/1140_454_2/Бурение горизонтальных скважин.jpg)
Drilling of horizontal wells
In 17 out of 28 horizontal wells, multistage hydraulic fracturing (MSHF) with proppant agent was performed, acid MSHF was performed in 6 wells
Learn more![](/upload/resize_cache/iblock/390/1140_454_2/фото.jpg)
Exploration at Dengizskoye and Verbovskoye license blocks
Neftisa company specialists analyzed available G&G data. The decision was taken to carry out an informative seismic survey using the 3D technique.
Learn more![](/upload/resize_cache/iblock/730/1140_454_2/Поисково-разведочные работы на Вареягском месторождении2.jpg)
Exploration at Vareyagskoye field
The presence of reserves at the Vareyagskoye oil field was successfully forecast using a new approach for identifying low-amplitude structural culminations.